Bond 2017: Royal Oak high school

Royal Oak High School will receive major renovations throughout the bond work. These projects include:

Facility upgrades:

  • Addition for performing arts classrooms and support spaces
  • Reconfigure and convert existing band/vocal area to art studio, large group instruction space, and support spaces
  • Upgrade science labs
  • Upgrade learning commons
  • Addition to cafeteria and renovate existing cafeteria/kitchen to allow for flexible lunch periods and extended learning area
  • Replace select doors
  • Replace select flooring
  • Upgrade select mechanical and electrical infrastructure and equipment

 

Athletic Plaza